Sales & Support: Request A Quote
Home ProductsDoor Frame Roll Forming Machine

5.5kw Metal PLC Door Frame Roll Forming Machine

5.5kw Metal PLC Door Frame Roll Forming Machine

5.5kw Metal PLC Door Frame Roll Forming Machine
5.5kw Metal PLC Door Frame Roll Forming Machine
5.5kw Metal PLC Door Frame Roll Forming Machine
Product Details:
Place of Origin: china
Certification: CE
Payment & Shipping Terms:
Minimum Order Quantity: 1
Price: Negotiate
Packaging Details: main machine package with film and the plc and part package with plastic
Delivery Time: 30 days
Payment Terms: T/T
Supply Ability: 100
Contact Now
Detailed Product Description
Use: Door Frame Making Material: Steel
Capacity: 8-12 Meter/min Voltage: 380v
Power: 5.5kw Warranty: 1 Year
High Light:

PLC Door Frame Roll Forming Machine

,

PLC Metal Roll Forming Machine

,

5.5kw Door Frame Roll Forming Machine

Metal door frame roll forming machine control by PLC

 

Metal door frame roll forming machine control by PLC is  automatic machine for product the metal door frame

The door frame need be cutting 45° then can be assembly door frame. we can design your model and your material

thickness. 




Profile


5.5kw Metal PLC Door Frame Roll Forming Machine 0
Specification

No. item  
1 Machine use door frame  roll forming machine
2 Material coil Galvalume ,galvanized,stainless steel
3 Coil thickness 20-30 gauge, 0.3mm-1.0mm
4 Machine dimention(L*W*H) 10000mm*800mm*1000mm
5 Voltage 240v/380v/415v ( can be do s yours)
6 Roller steps 20 steps
7 Roller material 45# steel with quenching
8 Working speed 12-15 meter/min
9 Product capacity 1.5-2.5 tons/hour
10 Machine weight 4500KG
11 Control system Panasonic PLC or siemens plc ( can be cutomized)
12 Drive motor power 5.5 kw
13 Cutting mode Automatic Hydraulic cutting
14 Cutting accuracy ±1mm
15 Control computer language English (can be customized )
16 Shaft diameter 80mm
17 lifetime 10-12 years
18 warranty 12 months
19 Loading and shipping Loading by container ,shipping by vessel


The product line working process:

5.5kw Metal PLC Door Frame Roll Forming Machine 15.5kw Metal PLC Door Frame Roll Forming Machine 25.5kw Metal PLC Door Frame Roll Forming Machine 35.5kw Metal PLC Door Frame Roll Forming Machine 4Decoiler feeding roll forming cutting received

5.5kw Metal PLC Door Frame Roll Forming Machine 5

 

Components and Technical Specificatons

(1) Manual decoiler It is used to support the steel coil and make the coil run to rotatory to realized the material sending. The decolier will be rotatory with the main roll forming machine. The capacity of this decoiler is 4000kg, the decoiler can support 508mm inner bore.

(2) Main roll forming machine The main roll forming machine is the most importent process for producting roof sheet .Our rollers adopt 45# steel ,the rollers will be polishing after lathe.Then need to electroplate so make the rollers more lustre and smooth.

5.5kw Metal PLC Door Frame Roll Forming Machine 6

(3) Feeding table Put People can put the raw material through the feeding table then go inside the roller to manufactuer and process.the feeding table can guarantee the material run in line and protect it from scratch.

(4) Hydraulic cutting system and cutting moulding
The hydraulic station power is 4kw ,hydraulic oil is 46# , cutting moulding is Cr12.

(5) Control computer box The The computer can make the machine working as your target pieces and length. All data can be adjusted by digit of it. The transducer of the computer can adjust the product speed and also can keep the caccuracy less than 1mm.

(6) Out table This part be welded by angle steel bar and square tube,it have the function of transport or support the products .It can collect products after finished working.

(7) Machine package and loading Main roll forming machine will be nude, the electric part or spare parts will be cover by film or be package by wood box,Common the machine need loading 20 GP or 40 GP container according to its volume.

Warranty&service

1. we provide 24 months’ guarantee . the guarantee against malfunctions duo to the manufactuering defeats or quality problem.
2. Repairs will not be performed even during the guarantee period in the follow conditions

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

 

Payment terms

40% advance payment by T/T
60% balance be paid before shipping T/T
Delivery

We can do FOB &CIF price

FOB form Tianjin port

CIF to destination port

The delivery time :

25-35 days after we receive your advance payment.
Shipping time:

If everything goes well, common the shipping time is 30-50 days, but different destination different transport time

 

 

Contact Details
cangzhou tuoming machine co.,ltd

Contact Person: Mr. zhang

Tel: 008618232715995

Fax: 0086-182-327-15995

Send your inquiry directly to us
Other Products